Refining and petrochemicals
Equipment for oil refining, gas processing and petrochemical plants.
Overview
Refining and gas processing units operate under pressure and high temperatures, so requirements for materials, design and testing are the strictest.
We supply process equipment for new-build and revamp projects and can act as the owner’s engineer.
How we work
We supply process equipment for refining: columns, reactors, heat exchangers, pressure vessels, heaters, pumps and compressors, as well as catalysts and consumables.
We support revamp and new-build projects: from manufacturer selection and techno-commercial evaluation to acceptance and delivery to site.
We work as an equipment supplier (EP+S) or as the owner’s engineer (PMC), controlling contractors, budget and schedule.
What we supply
Project stages
- 01
Enquiry and specification
We receive the specification or data sheet and clarify standards, operating conditions and certification.
- 02
Manufacturer selection
We vet factories and their oil & gas track record, collect bids and compare them technically and commercially.
- 03
Document approval
We agree drawings, materials, test programme and documentation with the client.
- 04
Manufacturing control
We inspect production, run acceptance tests and check material certificates.
- 05
Logistics and customs
We deliver the cargo, including oversized items, and handle customs and EAEU certification.
- 06
Commissioning and support
Installation supervision and commissioning by the manufacturer, spare parts during operation.
Custom-fit end-to-end solutions
-
Manufacturer selection and bid evaluation
-
Manufacturing control and inspections
-
Project logistics for heavy equipment
-
Customs clearance and certification
-
Project management (PMC)
Typical tasks
- Unit revamp
Supply of heat exchange and pumping equipment to replace worn units.
- New production
Technology comparison, supplier selection and equipment supply management for the project.
Questions and answers
Yes. We match equipment to existing units and parameters, accounting for space and tie-in constraints.
Material certificates, welding and NDT control, hydrotests and factory acceptance.
Yes, under PMC: tenders, contractor selection and control, budget and schedule.
Heavy items move under an individual scheme with route survey and special vehicles.
Yes, to the process specification.